Lagos govt reopens rehabilitated section of Ozumba Mbadiwe road

54

The Lagos State Government has reopened the rehabilitated Adetokunbo Ademola stretch of Ozumba Mbadiwe Road, connecting the 1004 area to Sir Samuel Manuwa Street on Victoria Island.

The reopening was announced on Saturday by Jubril Gawat, Senior Special Assistant on New Media to Governor Babajide Sanwo-Olu, in a post on X.

Gawat disclosed that the exercise was carried out earlier in the day by the Lagos State Office of Infrastructure and the Ministry of Transportation, under the supervision of the Governor’s Special Adviser on Infrastructure, Olufemi Daramola.

He added that the rehabilitation, initially scheduled to take 35 days, was completed in 33 days.

The rehabilitation was part of the Lagos State Government’s efforts to improve traffic flow and road conditions along the busy Ozumba Mbadiwe corridor, which connects parts of Victoria Island and Lekki.

Before the project began, the government announced a 35-day traffic diversion to allow contractors to carry out the rehabilitation, advising motorists to use alternative routes to reduce congestion.

The project prompted temporary changes to traffic movement around Adetokunbo Ademola Street, Civic Centre and Sir Samuel Manuwa Street.

“The Special Adviser, on behalf of Mr Governor, thanked Lagosians for their patience all through this period. He says this critical section was scheduled to be done in 35 days and it was eventually done in 33 days,” Gawat wrote.

He said further work along the Ozumba Mbadiwe axis would resume after the festive season in 2027.

The reopening followed the Lagos State Government’s October announcement of a 35-day rehabilitation project covering the stretch from Adetokunbo Ademola Street/Civic Centre to Samuel Manuwa Street/BJ, Victoria Island.

The government had announced traffic diversions to enable the rehabilitation, with motorists advised to use alternative routes during the construction period.

Gawat said the Special Adviser, on behalf of the governor, thanked Lagos residents for their patience during the rehabilitation.

He added that other sections of the road would be worked on after the festive season.